Skip to content
TRS Total Roofing Solutions

City Gates Roof Coating – Swansea

Three Roof Areas Refurbished With A Seamless Liquid Coating System

TRS completed a liquid roof coating project at City Gates in the centre of Swansea. The works covered three separate roof areas, each presenting its own set of challenges. The existing coverings had reached the end of their serviceable life and required a durable, seamless solution that could be installed around existing plant and difficult detailing. All works were delivered for Trident Surveyors.

Sector
Commercial
Location
Swansea
Client
Trident Surveyors
Roof area
—
System
Flat roof coating system across three separate roof areas
Completed liquid roof coating at City Gates, Swansea

The Challenge

The project involved three distinct roof areas on a busy commercial site. One of the most demanding elements was the need to strip out and reinstate the deck in a tightly confined space beneath plant. Access was restricted and working conditions were awkward.

Several outlets also passed through the parapet walls. These required careful redesign and detailing to ensure a reliable long-term seal. The building remained in use throughout, so the works had to be sequenced carefully to minimise disruption.

The Solution

A cold-applied liquid coating system was specified across all three roof areas. This allowed a seamless waterproof finish to be achieved while accommodating the complex geometry and restricted access points.

Where the existing deck was beyond repair it was stripped out and replaced. All upstands, penetrations and parapet outlets were carefully prepared and detailed before the coating was applied to form a continuous, durable membrane.

What we did

The existing failed coverings were removed where required. In the confined plant areas the old deck was carefully stripped out and a new substrate prepared. All surfaces were then cleaned and primed.

The liquid coating system was applied in stages to build up a seamless waterproof layer. Special attention was given to the parapet outlets and other critical details so that they were fully integrated into the new membrane. Night joints were maintained so the roofs remained weathertight at the end of each working day.

Keeping the building operational

City Gates is a live commercial centre. Works were planned and phased so that the building could continue to function throughout. Access routes, plant areas and public-facing zones were carefully managed.

Regular communication with the client and the surveyor helped keep the programme on track while protecting the day-to-day operation of the site.

Outcomes

Three separate roof areas were successfully refurbished with a seamless liquid coating system. The confined spaces beneath plant were fully addressed and the difficult parapet outlet details were resolved.

The finished roofs provide a clean, durable and fully weathertight surface. The project was completed for Trident Surveyors to the required standard.

Additional photos

  • Completed grey coated roof area with parapet detailing and rooftop plant

    Coated finish at the parapet and outlet details

  • Coated flat roof area in central Swansea with edge protection and scaffold in place

    Coated roof area with edge protection in place

  • Liquid coating part applied across a flat roof against a red brick wall

    Liquid coating being applied across the main area

  • Partly coated flat roof showing the boundary between coated and uncoated areas

    Coating progressing bay by bay

Similar building?

Ask for a survey-led recommendation.

Send a brief description of the building and roof. The initial roof survey and site visit are free of charge, and a member of the TRS team will be in touch to arrange it.