Oakington Manor Primary School Roof Replacement – Wembley

Garland R-MER CLAD Apex Roof System and StressPly Bituminous Flat Roof System

TRS carried out major roof replacement works at Oakington Manor Primary School in Wembley. The project addressed both the main apex roofs and adjoining flat roof areas. The existing coverings had failed, with clear evidence of water trapped beneath the single-ply membrane and deteriorating details. The solution combined a full strip-and-replace with a new Garland R-MER CLAD metal system on the apex sections and a high-performance bituminous system on the flat roofs.

Sector
Education
Location
Wembley, London
Client
Oakington Manor Primary School (Excellence in Education Trust)
Roof area
Approx. 600 m² apex + 100 m² flat
System
Garland R-MER CLAD (apex) and StressPly bituminous system (flat)
Guarantee
25-year single-point guarantee
Project hero photograph

The challenge

Inspection showed that the existing single-ply covering on the flat roof areas had failed, with water trapped beneath the membrane creating a "waterbed" effect. Perimeters, penetrations and flashings were also in poor condition. The main apex roofs required a long-term solution that would restore weathertightness and improve appearance while the school remained in use. Safeguarding, access and minimal disruption were essential throughout.

The solution

Two complementary Garland systems were specified. On the main apex roofs a full strip-and-replace was carried out using the R-MER CLAD profiled metal system. On the flat roof areas the failed single-ply was removed and a new StressPly bituminous system installed. This approach delivered a consistent, high-performance finish across the different roof types while providing a clear 25-year single-point guarantee.

What we did

  • Removed the failed single-ply membrane and any saturated insulation on the flat roof areas
  • Prepared the existing structure and installed a new StressPly bituminous waterproofing system
  • Stripped the existing covering on the apex roof sections
  • Installed a new Garland R-MER CLAD profiled metal roof system
  • Renewed flashings, penetrations and perimeter details
  • Ensured all works were completed in accordance with the manufacturer's specifications

Keeping the school operational

All works were carefully planned and phased so that the school could continue to operate. Access, safeguarding and site segregation were managed throughout. Regular communication with the school and the Trust ensured that teaching and daily routines were protected.

Outcomes & guarantee

  • Failed single-ply and existing coverings fully replaced
  • New Garland R-MER CLAD metal roof system on the main apex areas
  • New high-performance bituminous system on the flat roof sections
  • Improved weathertightness, appearance and long-term performance
  • School remained fully operational during the works
  • 25-year Garland single-point guarantee issued on completion